Lane Closures Needed for Pavement Surface Improvements on Highways in Pulaski County

Safety improvements to the driving surface mean lane closures on various highways in Pulaski County, according to Arkansas Department of Transportation (ARDOT) officials.

Weather permitting; the following overnight lane closures will occur from 10:00 p.m. to       6:00 a.m. the next morning to place a surface treatment on the pavement:

  • Interstate 30:
  • Aug. 16-19 | All Southbound | Between N. Alexander Rd. (Exit 126) & Northern Interchange (Exit 143)
  • Aug. 18-20 | Alternating Southbound | Between Curtis Sykes Dr. (Exit 142) & Northern Interchange (Exit 143)
  • Highway 67:
  • Aug. 16-19 | Alternating Southbound | Starting at Cabot/Highway 5 (Exit 16) and south for 1 mile
  • Aug. 16-19 | Alternating Northbound | I-40 Interchange
  • Interstate 630:
  • Aug. 18-20 | Alternating Eastbound & Westbound | Between Main St. (Exit 1) and Dr. MLK Jr. Dr. (Exit 2)
  • Aug. 19-21 | Alternating Westbound | Between Main St. (Exit 1) and Dr. MLK Jr. Dr. (Exit 2)
  • Aug. 19-21 | Alternating Eastbound | Between John Barrow Rd. (Exit 7) and
    S. Shackleford Rd. (Exit 8)
  • Aug. 20-24 | Alternating Eastbound | Between Main St. (Exit 1) and Dr. MLK Jr. Dr. (Exit 2)

-More-

This work is part of Job 012361, a statewide safety project to place ultrathin bond wearing course designed for use as a high performance surface treatment to correct distresses and restore a smooth surface.Orange cones, barrels, message boards, and signage will control traffic. Find additional travel information at IDriveArkansas.com or ARDOT.gov. You can also follow us on Twitter @IDriveArkansas for traffic and @myARDOT for everything else.