Work Continues on KFFB Tower Site

Engineers are continuing their work at KFFB’s tower site.  The power level of the transmitter has been raised, although we are not back to full power.  A new section of tower to replace the 100 feet that was lost in the ice storm is currently being manufactured and a new antenna structure has also been ordered.  Total work time should be approximately two to three weeks.

Web listeners will be glad to know the online stream of KFFB is back at our “Listen Live” link once again.  Service was restored late Monday.